Vital Access - Rope Access Specialists
home > references > case study 2

Industrial rope access vs. Hung scaffold for masonary repairs
Lowndes Square, London                                               View next case study


Hung_scaffold1
The brief was as follows:
 
To inspect and remove loose and cracked render,
  which was allowing water ingress into the building

 
To repair and re-decorate the affected area
  afterwards

 
Options: Hung Scaffold vs Rope Access
TASK
Hung Scaffold
  Erection 20 hours
  Task 30 hours
  Dismantle 20 hours
Vital Access
  Set up 1 hour
  Task 35 hours
  Clear 1 hour

TOTAL
70 hours
37 hours

We carried out this task in less than half the time it would have taken compared to scaffolding, with minimum disruption.
 
Value
On this task Vital Access delivered an access solution that was unrivalled by scaffolding or
any other means in it's effiency,lack of disruption and safety. The work was carried out to
a high standard and delivered a cost saving of £3,000 in comparison with using a scaffold.
 

Consult our references or view another case study to see how best rope access
can benefit your needs.
 
Please contact us for a no obligation consultation.
 

back to top